ADA School Maintenance
– Boise, Idaho –
Installed the Fire Sprinkler System for the New Operations and Maintenance Building and a New Storage Building of the Boise School District in South Boise. The O&M Building included an 8” underground lead-in, an electric fire pump, two wet fire sprinkler systems, one dry system and approximately 660 sprinkler heads. The Storage Building included a 6” underground lead-in and a dry sprinkler system with approximately 125 sprinkler heads.